

Water Purifier Installation
₹599.00 Original price was: ₹599.00.₹449.00Current price is: ₹449.00.
- Pre-Installation Check – Water Quality & Pressure Assessment, Suitable Location Selection
- Unboxing & Inspection – Product Verification, Accessories & Filter Check
- Water Inlet & Outlet Connection – Pipe Fitting, Leak-Proof Setup
- Filter & Membrane Installation – RO/UV/UF Filter Setup, Proper Alignment
- System Flushing & Testing – Initial Water Flow Check, Leak Detection
- Final Performance Check – Purification Quality Test, Flow Rate Assessment
Related products
Chimney (Wall Mounted) Installation
-
Pre-Installation Services
Site Inspection, Measurement Check, Ducting & Vent Placement -
Unpacking and Inspection
Careful Unboxing, Product Check, User Manual Review -
Electrical & Ventilation Setup
Power Supply Check, Proper Earthing, Vent Pipe Installation -
Mounting the Chimney
Height Adjustment, Secure Wall Fixing, Bracket Installation -
Duct Connection & Sealing
Pipe Fitting, Leak-proof Sealing, Exhaust Direction Check -
Operational Testing
First Run Test, Suction Power Check, Noise & Vibration Inspection -
User Orientation
Usage Demonstration, Cleaning & Maintenance Tips, Troubleshooting Basics
Computer Repair
- Initial Inspection – Power Supply, Boot & Performance Check
- Hardware Repair – CPU, RAM, Hard Drive & Motherboard Diagnosis/Fix
- Software Troubleshooting – OS Issues, Driver Updates & Virus Removal
- Cooling System & Fan Repair – Overheating Prevention & Fan Replacement
- Port & Connectivity Fix – USB, HDMI, Ethernet & Wi-Fi Issue Resolution
- Final Testing & Performance Check – Speed, Storage & System Stability Assessment
Geyser Un-Installation
- Power Supply Disconnection – Safe Shutdown, Electrical Plug Removal
- Water Supply Cut-Off – Inlet & Outlet Valve Closure, Pressure Release
- Drainage & Water Removal – Tank Emptying, Pipe Detachment
- Electrical Wiring Disconnection – MCB & Earthing Wire Removal
- Wall Mount/Unit Detachment – Safe Unmounting, Bracket & Screw Removal
- Final Inspection & Packing – Damage Check, Proper Packing for Reinstallation
Inverter/Non-Inverter Deep Freezer Repair
-
Initial Inspection
Power Supply Check, Compressor & Thermostat Diagnosis, Cooling Performance Assessment -
Refrigerant & Cooling System Check
Gas Level Inspection, Leak Detection, Condenser & Evaporator Coil Cleaning -
Compressor & Motor Inspection
Relay & Capacitor Check, Motor Function Testing, Noise & Vibration Fix -
Thermostat & Temperature Control Repair
Temperature Sensor Testing, Thermostat Calibration, Cooling Adjustment -
Defrosting & Drainage Check
Ice Buildup Removal, Drain Pipe Cleaning, Auto-Defrost System Inspection -
Door & Seal Repair
Gasket Condition Check, Door Alignment Adjustment, Air Leakage Fix
Island Chimney Uninstallation
-
Pre-Uninstallation Check
Power Supply Disconnection, Safety Inspection, Duct & Mounting Assessment -
Duct & Vent Disconnection
Exhaust Pipe Removal, Sealant Cleaning, Ceiling Outlet Closure -
Chimney Detachment
Bracket & Screw Removal, Secure Chimney Lowering, Ceiling Protection -
Electrical Disconnection
Power Cord Removal, Wire Safety Insulation, Socket & Switch Check -
Final Area Cleanup
Ceiling & Surrounding Area Cleaning, Residual Sealant Removal, Dust & Grease Wipe-down -
Additional Services
Old Chimney Disposal, New Chimney Installation, Duct Modification
Microwave Repair
- Initial Inspection – Power Supply, Display & Button Function Check
- Heating Issues Fix – Magnetron, Diode & Capacitor Testing/Replacement
- Turntable & Motor Repair – Rotation Alignment, Noise & Vibration Fix
- Door & Seal Repair – Latch Adjustment, Gasket & Hinge Fixing
- Control Panel & Wiring Check – PCB, Fuse & Electrical Connection Inspection
- Final Testing & Safety Check – Heating Performance, Radiation Leakage & Safety Assessment
Water Purifier Services
- Basic Service – External Cleaning, Water Flow & Leakage Check
- Filter & Membrane Replacement – RO/UV/UF Filter Cleaning or Replacement
- Deep Cleaning Service – Tank, Pipe & Nozzle Sanitization, Scale Removal
- Pump & Motor Inspection – Pressure Pump Testing, Noise & Vibration Fix
- UV Lamp & Electrical Check – UV Lamp, Wiring & PCB Inspection
- Final Testing & Quality Check – Water Purity, Flow Rate & Pressure Assessment
Window AC Installation
- Pre-Installation Services Site Assessment, Measurement Check, Window Frame Inspection
- Unpacking and Inspection Careful Unboxing, Product Check, User Manual Review
- Electrical and Structural Setup Power Supply Check, Window Frame Preparation, Insulation & Seal Check
- Mounting the AC Unit Positioning the AC, Securing the Unit, Angle Adjustment for Drainage
- Operational Testing First Run Test, Airflow & Cooling Check, Noise & Vibration Check
- User Orientation Usage Demonstration, Maintenance Tips, Troubleshooting Basics
- Additional Services Accessory Installation, Old AC Removal, Custom Modifications
Reviews
There are no reviews yet.