

Wall Mounted Chimney Uninstallation
₹599.00 Original price was: ₹599.00.₹299.00Current price is: ₹299.00.
-
Pre-Uninstallation Check
Power Supply Disconnection, Safety Inspection, Duct & Mounting Assessment -
Duct & Vent Disconnection
Pipe Removal, Sealant Cleaning, Exhaust Outlet Closure -
Chimney Detachment
Bracket & Screw Removal, Secure Chimney Lowering, Wall Protection -
Electrical Disconnection
Power Cord Removal, Wire Safety Insulation, Socket & Switch Check -
Final Area Cleanup
Wall & Ceiling Cleaning, Residual Sealant Removal, Dust & Grease Wipe-down -
Additional Services
Old Chimney Disposal, New Chimney Installation, Duct Modification
Related products
Chimney (Wall Mounted) Installation
-
Pre-Installation Services
Site Inspection, Measurement Check, Ducting & Vent Placement -
Unpacking and Inspection
Careful Unboxing, Product Check, User Manual Review -
Electrical & Ventilation Setup
Power Supply Check, Proper Earthing, Vent Pipe Installation -
Mounting the Chimney
Height Adjustment, Secure Wall Fixing, Bracket Installation -
Duct Connection & Sealing
Pipe Fitting, Leak-proof Sealing, Exhaust Direction Check -
Operational Testing
First Run Test, Suction Power Check, Noise & Vibration Inspection -
User Orientation
Usage Demonstration, Cleaning & Maintenance Tips, Troubleshooting Basics
Geyser Deep Service
- Initial Inspection – Power Supply, Heating Performance & Leakage Check
- Tank Cleaning & Descaling – Hard Water Deposits & Sediment Removal
- Heating Element & Thermostat Check – Faulty Coil Cleaning/Replacement, Temperature Calibration
- Pipe & Valve Cleaning – Inlet/Outlet Pipe Descaling, Leak Prevention
- Electrical Wiring & Safety Check – MCB, Earthing & Connection Inspection
Geyser Installation
- Pre-Installation Check – Water Pressure & Electrical Supply Assessment
- Wall Mounting & Positioning – Secure Fixing, Stability & Safety Check
- Water Inlet & Outlet Connection – Pipe Fitting, Leak-Proof Setup
- Electrical Wiring & Connection – Proper Voltage Check, Earthing & MCB Setup
- System Testing & First Run – Heating Efficiency, Leak & Safety Inspection
- Final Check & User Guidance – Temperature Control, Maintenance Tips & Safety Instructions
Geyser Repair
- Initial Inspection – Power Supply, Heating & Leakage Check
- Heating Element & Thermostat Repair – Faulty Coil Replacement, Temperature Adjustment
- Water Leakage Fix – Tank, Valve & Pipe Leak Detection & Repair
- Electrical Wiring & Connection Check – MCB, Earthing & Faulty Wiring Fix
- Sediment & Scale Removal – Tank Cleaning, Hard Water Deposits Removal
- Final Testing & Safety Check – Heating Efficiency, Water Flow & Safety Assessment
Laptop Repair
- Initial Inspection – Power Supply, Boot & Performance Check
- Screen & Display Repair – Flickering, Black Screen & Dead Pixel Fixing
- Keyboard & Touchpad Repair – Key Malfunction, Touchpad Sensitivity Fix
- Battery & Charging Issue Fix – Battery Replacement, Charging Port Repair
- Software & OS Troubleshooting – OS Installation, Driver Updates & Virus Removal
- Final Testing & Performance Check – Speed, Storage & System Stability Assessment
Microwave Repair
- Initial Inspection – Power Supply, Display & Button Function Check
- Heating Issues Fix – Magnetron, Diode & Capacitor Testing/Replacement
- Turntable & Motor Repair – Rotation Alignment, Noise & Vibration Fix
- Door & Seal Repair – Latch Adjustment, Gasket & Hinge Fixing
- Control Panel & Wiring Check – PCB, Fuse & Electrical Connection Inspection
- Final Testing & Safety Check – Heating Performance, Radiation Leakage & Safety Assessment
Water Purifier Installation
- Pre-Installation Check – Water Quality & Pressure Assessment, Suitable Location Selection
- Unboxing & Inspection – Product Verification, Accessories & Filter Check
- Water Inlet & Outlet Connection – Pipe Fitting, Leak-Proof Setup
- Filter & Membrane Installation – RO/UV/UF Filter Setup, Proper Alignment
- System Flushing & Testing – Initial Water Flow Check, Leak Detection
- Final Performance Check – Purification Quality Test, Flow Rate Assessment
Window AC Installation
- Pre-Installation Services Site Assessment, Measurement Check, Window Frame Inspection
- Unpacking and Inspection Careful Unboxing, Product Check, User Manual Review
- Electrical and Structural Setup Power Supply Check, Window Frame Preparation, Insulation & Seal Check
- Mounting the AC Unit Positioning the AC, Securing the Unit, Angle Adjustment for Drainage
- Operational Testing First Run Test, Airflow & Cooling Check, Noise & Vibration Check
- User Orientation Usage Demonstration, Maintenance Tips, Troubleshooting Basics
- Additional Services Accessory Installation, Old AC Removal, Custom Modifications
Reviews
There are no reviews yet.